Line 3 Stations, Mumbai Metro

AECOM were the interim consultants for this project. They had to design the station buildings and were to complete the design in all respects till the tendering stage. The special underground stations on the line which could not be constructed using the traditional cut & cover method were outsourced to us.

 

These were 7 stations in all and were proposed as NATM station due to scarcity of land on the surface. NFPA compliance was designed for in all stations & the system was designed for an 8 coach train with a minimum train frequency of 2 minutes. One of the stations, Hutatma Chowk was in a conservation zone in the town area in Mumbai and the designs of the entry / exit structure were approved by a specially appointed urban design committee.

 

Completed – 2013

Client – AECOM

Plot Size – varied

Built Up Area – varied