Project Detail

Line 2A, Mumbai

JV with AECOM for the detailed design of the 18 stations on this corridor. All of them are balanced cantilevers based on the proposal developed by AA for the Lucknow metro. Three of the stations vary operationally as they are: a terminal station, a three-track station and a triple elevated station crossing the existing Line 1 of the Mumbai Metro. The triple elevated station is one of the highest in the country. The designs of these stations highlight the flexibility and advantages of the layout in the balanced cantilever station type.

 

 

Completed – Ongoing

Client – Aarvee for MEGA

Plot Size – varied

Built Up Area – varied